info@microbohk.com
0086-13630172333
  • RBWLL-AC21A
    ❤ Add to collection
  • RBWLL-AC21A

    • ¥0.00
      ¥0.00
      ¥0.00
      ¥0.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:0.00KG
    • Quantity:
    • (Inventory: 99999)
Description
Product Specification
Product Advantages

1200 ML Water Tank
Meet the requirements of a day of use at the same time to avoid the residual water tank for a long time after the deterioration of air pollution problems.
ABS
ABS 121 good quality plastic material.
Little Night Light
No fear of bumps in the dark.
Ultraviolet Disinfection Lamp (Optional)
Take care of family health and refuse secondary pollution.
24 Hours Timer
No need to worry about startup and shutdown. It doesn't matter if you forget to shut down when you go out. If there is no operation within 24 hours, it will shut down automatically.
Hot Sell
     RBW V-13         RBW-AC21A            RBW LL-19A              RBW LL-16A             RBW LL-Q8B
Our Factory

01:00
How Do We Guarantee Quality?

100% product inspection

Check all quality in the production line, ensure the qualified rate of finished products more than 98%

Aging test

We will randomly select the finished products from each order to test the life of the products and ensure the quality of the finished products.
FAQ
Q : Will you supply sample for testing the quality ?
A : Yes , we accept a sample order before mass order .

Q : How do you guarantee quality ?
A : Before loading , we have a strict quality check system, 1 year for whole unit .

Q : Can you do my own logo ?
A : Yes , we accept OEM customized service .

Q : What is the lead time for mass production ?
A : It is depends on the order quantity and the season when you place the orders , The lead time of MOQ is about 20-25days .
Q: Where is your factory?
A: We are in Foshan City, Shunde District. There is 1 hour car ride from Canton Fair, 1.5 hours car-ride from Guangzhou Baiyun International airport, 40 mins car-ride from Guangzhou south Railway Station.

If you don’t get satisfactory answers as above, leave your questions to us, we can reply your question within 30 minutes during working time.


  • User name Member Level Quantity Specification Purchase Date
  • Satisfaction :
No evaluation information